Thursday, December 21, 2006

Christmas Holidays


The library closes at 6pm today Thursday December 21, but construction will continue all through the holiday. We reopen on January 2nd. Happy Holidays everyone!

Monday, December 18, 2006

Construction Update

Here's what's happening:
Work continues on the demolition of the old main entrance. Drilling holes in the floors (core drilling) will be done on all 3 floors to make way for the new electrical rooms and new bathrooms. A lot of work is being done in the maintenance area on the lower level to get the new server room ready. A street cleaning machine came through the parking lot late Friday to help clear up all the mud from last week's wet weather. The pile drilling machine completed 5 test holes last week. These piles are now being examined before the drilling of the 111 piles begin next week. The good news is this method of pile driving is not nearly as disruptive as we thought it would be. The installation of new duct work is nearly finished on the first floor and the dry walling of office space has begun. Unfortunately, the free coffee has ended for the semester.

Tuesday, December 12, 2006

Free Coffee!!!

The first floor is progressing nicely, walls are going up instead of down now. Luckily, by 2:30 the construction quiets down. This means that studying is most easily accomplished between 2:30pm and 2am in the library.



To keep you awake until 2am, the library is supplying free coffee in our vending room on the lower level through finals and possibly beyond..... Come and get a cup before heading upstairs to study. Enjoy!

Monday, December 4, 2006

First Floor and the Big Hole



There's a big hole in front of the library. It's where the lower level auditorium is going to be. Here's a look from above.






They have started construction on the first floor which means everything has been ripped out and they are putting up offices near the windows. It's a long way to go, but here's a glimpse of the construction.





Another view, here's where technical services used to be, it will now be Library Instruction classrooms. What do you think?

Tuesday, November 28, 2006

Lights out

Boom,
The lights went out at 9pm tonight. Apparently 1/2 of Loyola has lost power as well as a bunch of neighborhoods all the way up to The Swallow on Northern and York. OUCH! We've closed the library and will reopen in the morning (if the power is on). This doesn't have anything to do with the library construction, just letting you know. Goodnight.

Mr. Eaton says:

We are still working on getting the handicapped, unisex bathroom on the lower level switched over from the men's room to the women's room. In the meantime the women's room will continue to be closed on that floor. A latch lock has been installed in the unisex bathroom. Just as an added note... The men's room on the 2nd and 3rd floors will be closed in the very near future. A determination on which floor will have the men's room (either 2nd or 3rd) is being studied.

Also, the clocks are off.... Eaton says:
We are working on a solution for the clocks. Demolition of the 1st floor caused many power disruptions to the master clock system. Hopefully the clock problem will be fixed soon.

Monday, November 27, 2006

More Pix!!

There is a very large hole in front of the library. Here are some pictures to give you an idea of what we're seeing. Imagine viewing these to the sound of Jackhammers (but only until 3pm then it's quiet time in the library)



An exterior view of the digging looking across from Butler/Hammerman.








Allen working hard in his hard hat.









The digger digging.






First floor deconstruction view from the missing reference desk.