Take a look at what is going on in and out of the library:
.jpg)
Check out the windows, aren't they great. They've installed almost all of them now. They have also laid the concrete base for where the steps will go.

They are starting the furnishings on the first floor. The ceilings are in and everything is looking clean. They've closed the bathroom on the lower level so the girls room is on the second floor and the boys room is on the third floor on the south side of the building.