Friday, April 27, 2007

Library going Vertical

Look at this! The second floor of the library addition has been poured and the first floor ductwork is all done and drywall is going up. The elevator shaft must be drilled because we haven't heard any drilling in the last few days.

Here's a view of the exterior looking from the College of Notre Dame Side.




Nick at the Customer Service desk with a student.





That beautiful shiny ductwork!!