There will be core drilling (drilling of small holes in the floor all the way through to the next floor) on the 2nd floor in the center open area. The drilling will only last until noon on each day. The number of days has not been determined. There will be some noise and dirt along with the drilling. The contractor has promised to protect the contain the area.
Pictures coming soon, I promise!
Monday, February 12, 2007
Subscribe to:
Posts (Atom)