Boom,
The lights went out at 9pm tonight. Apparently 1/2 of Loyola has lost power as well as a bunch of neighborhoods all the way up to The Swallow on Northern and York. OUCH! We've closed the library and will reopen in the morning (if the power is on). This doesn't have anything to do with the library construction, just letting you know. Goodnight.

Mr. Eaton says:

We are still working on getting the handicapped, unisex bathroom on the lower level switched over from the men's room to the women's room. In the meantime the women's room will continue to be closed on that floor. A latch lock has been installed in the unisex bathroom. Just as an added note... The men's room on the 2nd and 3rd floors will be closed in the very near future. A determination on which floor will have the men's room (either 2nd or 3rd) is being studied.

Also, the clocks are off.... Eaton says:
We are working on a solution for the clocks. Demolition of the 1st floor caused many power disruptions to the master clock system. Hopefully the clock problem will be fixed soon.

Monday, November 27, 2006

More Pix!!

There is a very large hole in front of the library. Here are some pictures to give you an idea of what we're seeing. Imagine viewing these to the sound of Jackhammers (but only until 3pm then it's quiet time in the library)



An exterior view of the digging looking across from Butler/Hammerman.








Allen working hard in his hard hat.









The digger digging.






First floor deconstruction view from the missing reference desk.



Sunday, November 26, 2006

What a beautiful weekend, hope everyone was able to get outside and enjoy the fresh air and sunshine. The electrical work was done over Thanksgiving weekend. It went off without a hitch and everything is online. New signage is up to steer you in the right direction. Hopefully I'll get more pictures, especially of the barren first floor tomorrow.

Tuesday, November 21, 2006

Turkey Weekend


The library closes at 8 tonight. I'm here of course 'til we close. Tomorrow and Friday the construction crew will work on electrical fittings and hopefully will finish by late Friday night so that we can open again on Saturday. Have a wonderful holiday weekend and drive safe in all that rain we're supposed to get. Be back Sunday night.......

Saturday, November 18, 2006

Saturday stream & sewage

All is quiet in the library this morning, but outside there is a big truck working on the Stony Run stream project. You may have seen the pipes they've been laying out for the last week or so. The project should take 2-3 weeks. Rumor has it they will take down the dam by the bridge and make the pond next to the library into a streambed. They are doing work like this as well under Charles Street by Evergreen House and around Loyola's Newman Towers, running all the way through Stony Run park. Pix to come.

Thursday, November 16, 2006

Nasty Thursday.. some construction pix.

I got soaked walking over to Loyola for lunch today. What a nasty day. I'm glad I'm not a construction worker digging in the mud. It's good to know that you don't actually have to come out in this weather if you want to talk to a librarian or do research. Call-Email-Chat with us, we're here! Here are some pictures of the construction.


Alan swinging a sledgehammer










Nancy surveying the first floor move.








Moving the books, thank goodness for student workers, and Eaton and Alan and Steve and John.......